Every number on this page was produced by our production engine from these documents. BRISBANE SUPPLY COMPANY is a fictional supplier and all five documents below are synthetic test paper. Nothing was staged or invented; every finding below is shown exactly as the engine returned it.
This is what a TallyThat month audit looks like when it comes back. Five documents went in. Below is every confirmed finding, every dollar, and the signed paper behind each one, so you can judge the work before you hand us your own month.
One supplier invoice, the rate quote it should follow, and the three signed delivery tickets the drivers left behind. This is everything the engine was given.
Invoice BSB-9911, 4 line items plus surcharges and fees.
Every dollar below is arithmetic from a signed ticket or the rate quote. Nothing estimated.
Your invoices this month list 4 deliveries. You have signed tickets behind 3 of them.
The same delivery appears more than once on these invoices. This one is not your paperwork. It is worth asking your supplier about before you pay.
A flag like this is a question, not an accusation. The audit shows you the line and the paper behind it, and leaves the conversation with your rep to you.
Confirmed means the discrepancy is proven by the signed ticket or the rate quote, with the exact dollar amount shown. The audit never pads a dispute package with maybes: anything it cannot prove from the paper is flagged for your review instead of being claimed.
Invoice BSB-9911 contains two identical delivery lines for Ticket BSB-7705, Truck 54, dated 07/16/2026, each billing 9.0 CY at $150.00 for a material charge of $1,350.00. There is only one signed Ticket BSB-7705 in the uploaded records. The second occurrence of this line — billed at $1,350.00 — is a duplicate charge and should be removed. Full duplicated line disputed: $1,350.00 material + $0.00 standby = $1,350.00.
The invoice bills Ticket BSB-7702, Truck 51 for 10.0 CY at a material charge of $1,500.00. However, signed Ticket BSB-7702 shows that only 7.5 CY were placed, with 2.5 CY returned to the plant unused. The ticket's customer remarks state 'placed 7.5 yds only - overordered,' the driver notes state '2.5 CY returned to plant unused. no standby.,' and the ticket records Placed (CY): 7.5 and Returned (CY): 2.5. The rate agreement (Quote No. Q-8802) explicitly states 'Concrete returned to the plant unused is not billed; the customer is billed only for quantity placed.' The invoice should bill 7.5 CY, not 10.0 CY. Overbilled 2.5 CY at $150.00/CY (from per-line material charges) = $375.00.
The invoice includes a charge described as 'ENVIRONMENTAL COMPLIANCE SURCHARGE' for $28.00. The contract terms on the invoice and the signed rate agreement (Quote No. Q-8802) authorize an environmental fee of $15.00 per load — a fixed per-load fee. The $28.00 'Environmental Compliance Surcharge' does not correspond to any per-load count or rate described in the contract terms, and it is a second, separate environmental fee line in addition to the 'ENVIRONMENTAL FEE — 3 LOADS @ 15.00' line already billed at $45.00. The contract terms authorize only one environmental fee category at $15.00 per load; a second environmental surcharge line of $28.00 is not authorized by any provision in the signed ticket contract terms or the rate agreement and constitutes a duplicate surcharge for the same fee category. This $28.00 charge should be removed.
The invoice bills Ticket BSB-7708 at $158.00 per CY, but the contract terms state the agreed material rate is $150.00 per CY. The rate difference of $8.00 per CY on 8 delivered CY is an overcharge of $64.00.
The same findings, formatted to send to a supplier rep: each dispute with its exact amount, a formal statement requesting a corrected invoice or credit memo, and a photographed signed-ticket exhibit page for every ticket cited, with highlight boxes on the exact fields the findings point to. This is the document you would attach to your next payment, reconciling the month before you pay it.
PDF · 5 pages · the real download from the audit shown above
Statement, invoices, tickets, and your rate quote, in one drop. You get back the same page you just read, about your own money.
Run this on your own month. First month free.No credit card. No contract. Results in minutes.