Real engine run

Every number on this page was produced by our production engine from these documents. BRISBANE SUPPLY COMPANY is a fictional supplier and all five documents below are synthetic test paper. Nothing was staged or invented; every finding below is shown exactly as the engine returned it.

Sample audit · One month, start to finish

One invoice, three signed tickets, a rate quote.
$1,817.00 the paper does not support.

This is what a TallyThat month audit looks like when it comes back. Five documents went in. Below is every confirmed finding, every dollar, and the signed paper behind each one, so you can judge the work before you hand us your own month.

The paper

Five documents. The whole month.

One supplier invoice, the rate quote it should follow, and the three signed delivery tickets the drivers left behind. This is everything the engine was given.

First page of the Brisbane Supply Company invoice BSB-9911, 4 line items plus surcharges and fees, invoice total $5,537.00
Invoice
brisbane_supply.invoice.pdf
First page of the rate agreement, Quote No. Q-8802
Rate quote
brisbane_supply.invoice_quote.pdf
Signed delivery ticket BSB-7702, Truck 51
Signed ticket
brisbane_supply.ticket_7702.jpg
Signed delivery ticket BSB-7705, Truck 54
Signed ticket
brisbane_supply.ticket_7705.jpg
Signed delivery ticket BSB-7708, Truck 51
Signed ticket
brisbane_supply.ticket_7708.jpg
The month at a glance

What the invoice asks for.
What the tickets support.

Invoice total
$5,537.00

Invoice BSB-9911, 4 line items plus surcharges and fees.

Confirmed disputes
$1,817.00

Every dollar below is arithmetic from a signed ticket or the rate quote. Nothing estimated.

Paperwork check

Your invoices this month list 4 deliveries. You have signed tickets behind 3 of them.

Flagged · billed twice
1 line bills a ticket number you already have
Ticket BSB-7705Truck 5407/16/2026Billed again at $1,350.00

The same delivery appears more than once on these invoices. This one is not your paperwork. It is worth asking your supplier about before you pay.

A flag like this is a question, not an accusation. The audit shows you the line and the paper behind it, and leaves the conversation with your rep to you.

The findings

Four confirmed findings.
Each explanation is the engine's own, word for word.

Confirmed means the discrepancy is proven by the signed ticket or the rate quote, with the exact dollar amount shown. The audit never pads a dispute package with maybes: anything it cannot prove from the paper is flagged for your review instead of being claimed.

Confirmed
The same delivery billed twice
$1,350.00Disputed
Ticket BSB-7705Truck 5407/16/2026Billed $1,350.00 · Supported $0.00
Engine explanation, verbatim

Invoice BSB-9911 contains two identical delivery lines for Ticket BSB-7705, Truck 54, dated 07/16/2026, each billing 9.0 CY at $150.00 for a material charge of $1,350.00. There is only one signed Ticket BSB-7705 in the uploaded records. The second occurrence of this line — billed at $1,350.00 — is a duplicate charge and should be removed. Full duplicated line disputed: $1,350.00 material + $0.00 standby = $1,350.00.

Confirmed
Billed for concrete that went back to the plant
$375.00Disputed
Ticket BSB-7702Truck 5107/16/2026Billed $1,500.00 · Supported $1,125.00
Engine explanation, verbatim

The invoice bills Ticket BSB-7702, Truck 51 for 10.0 CY at a material charge of $1,500.00. However, signed Ticket BSB-7702 shows that only 7.5 CY were placed, with 2.5 CY returned to the plant unused. The ticket's customer remarks state 'placed 7.5 yds only - overordered,' the driver notes state '2.5 CY returned to plant unused. no standby.,' and the ticket records Placed (CY): 7.5 and Returned (CY): 2.5. The rate agreement (Quote No. Q-8802) explicitly states 'Concrete returned to the plant unused is not billed; the customer is billed only for quantity placed.' The invoice should bill 7.5 CY, not 10.0 CY. Overbilled 2.5 CY at $150.00/CY (from per-line material charges) = $375.00.

Confirmed
A second environmental fee the contract never authorized
$28.00Disputed
Invoice surcharge line07/16/2026Billed $28.00 · Supported $0.00
Engine explanation, verbatim

The invoice includes a charge described as 'ENVIRONMENTAL COMPLIANCE SURCHARGE' for $28.00. The contract terms on the invoice and the signed rate agreement (Quote No. Q-8802) authorize an environmental fee of $15.00 per load — a fixed per-load fee. The $28.00 'Environmental Compliance Surcharge' does not correspond to any per-load count or rate described in the contract terms, and it is a second, separate environmental fee line in addition to the 'ENVIRONMENTAL FEE — 3 LOADS @ 15.00' line already billed at $45.00. The contract terms authorize only one environmental fee category at $15.00 per load; a second environmental surcharge line of $28.00 is not authorized by any provision in the signed ticket contract terms or the rate agreement and constitutes a duplicate surcharge for the same fee category. This $28.00 charge should be removed.

Confirmed
A rate above the agreement
$64.00Disputed
Ticket BSB-7708Truck 5107/16/2026Billed $1,264.00 · Supported $1,200.00
Engine explanation, verbatim

The invoice bills Ticket BSB-7708 at $158.00 per CY, but the contract terms state the agreed material rate is $150.00 per CY. The rate difference of $8.00 per CY on 8 delivered CY is an overcharge of $64.00.

Confirmed disputes · Invoice BSB-9911
Duplicate line, BSB-7705$1,350.00
Returned quantity, BSB-7702$375.00
Unauthorized fee$28.00
Rate mismatch, BSB-7708$64.00
Total$1,817.00
The deliverable

The dispute package this month produced.

Sample dispute package

The same findings, formatted to send to a supplier rep: each dispute with its exact amount, a formal statement requesting a corrected invoice or credit memo, and a photographed signed-ticket exhibit page for every ticket cited, with highlight boxes on the exact fields the findings point to. This is the document you would attach to your next payment, reconciling the month before you pay it.

PDF · 5 pages · the real download from the audit shown above

Download the sample package
Your turn

Your month has paper
like this too.

Statement, invoices, tickets, and your rate quote, in one drop. You get back the same page you just read, about your own money.

Run this on your own month. First month free.

No credit card. No contract. Results in minutes.